To effectively pair a Battery Energy Storage System (BESS) with an electrical air compressor on a construction site, a large diesel generator is necessary for sufficient energy. However, the generator's air and noise pollution can create an unsafe working environment for workers.

Case Study - Foundation Work

AEE BESS Job Reference_Vibro_01 _edited_
The Challenge 

The main challenge of pairing a BESS with an electrical air compressor is the lack of sufficient grid support on the construction site.


1. Power Demand

  • Electrical air compressors often need to operate continuously under high power demand. They are usually paired with a large diesel generator.

2. Insufficient Power Grid

  • Many construction sites are often situated in areas with a weak power grid. As a result, the limited power supply from the grid cannot meet the high energy demands of electric air compressors. However, electric air compressors are essential for foundation work.

The Result
  • Reduces Carbon Footprint: By lowering diesel usage, BESS contributes to a decrease in greenhouse gas emissions, supporting global sustainability goals.

  • Enhances Energy Efficiency: The system optimizes energy use, allowing for smoother operations and reduced waste, further promoting sustainable construction practices.

  • Air Quality Improvement: With zero emissions, the BESS eliminates harmful pollutants associated with diesel generators, enhancing air quality and reducing health risks for construction workers.

  • Safe working environment: The BESS operates quietly, significantly decreasing noise pollution.The reduction in noise and air pollution fosters a safer and more comfortable atmosphere, ultimately leading to improved worker productivity and morale.

Site Map
Find Us
Email:
Australia Office:

19 Young St, Adelaide SA 5000, Australia

Hong Kong Office:
Newsletter

Suite 1102, 11/F

Chinachem Century Tower,

178 Gloucester Road,

Wanchai, HK

Tel: 

(852) 2544 8821

  • Instagram
  • Facebook
  • LinkedIn
  • Youtube

©2025 by Advance Eco Energy. ​​All rights reserved.

bottom of page